Loading
Page views this IP this session = 1 of 10 unsubscribed pagesGlenbuck Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Glenbuck Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Glenbuck Wind Farm (Wind , Active) Location in the UK : N.Ireland, glarryford Type of installation: Wind on/offshore: on Turbines :4 Capacity : 9.2 MW Approx Date of 1st power generation: December 2016
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
(From TCI) This EIA was prepared in support of a full planning application for a five turbine wind farm of up to 15MW capacity, associated transformers and electric cabling, access tracks, temporary construction compound, permanent substation, road improvement and all associated ancillary site works. The site address is defined as “land approximately 1km north of 81 Glenbuck Road, Dunloy, Co. Antrim”.
NB Turbine 06 was submitted fro planning permission in July 2005
TCI Renewables says Vestas, Other media says Enercon or Siemens. 4 turbines live. Might not be correct 4 on map For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Glenbuck81 Glenbuck Road Dunloy Ballymoney BT44 9EL Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Glenbuck 6.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Antrim Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3962 / EN00411
District:
|
Applicant: |
Energia Renewables
Application :
D/2006/0599/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
109 |
Calculated capacity: |
6.9 |
Site Address: |
Glenbuck
|
|
|
County: |
Co. Antrim Region: Northern Ireland
|
OS Coordinates: |
118000 / 118000
|
Development Status: |
Operational
|
Application Submitted: |
11/1/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2016
|
|
|
Generator Live |
3/1/2017
|
This Record Last Updated: |
12/15/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Glenbuck 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Antrim Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3961 / EN00410
District:
|
Applicant: |
Energia Renewables
Application :
D/2005/0628/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
109 |
Calculated capacity: |
2.3 |
Site Address: |
Glenbuck, Dunloy
|
|
|
County: |
Co. Antrim Region: Northern Ireland
|
OS Coordinates: |
118000 / 118000
|
Development Status: |
Operational
|
Application Submitted: |
6/6/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2016
|
|
|
Generator Live |
3/1/2017
|
This Record Last Updated: |
12/4/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Glenbuck
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00500NQNI
|
Capacity: |
9200
|
Status: |
Live
|
Accreditation Date: |
6/6/2005
|
|
|
Commission Date: |
2/21/2017
|
|
|
Applicant: |
Mosslee Limited
|
Applicant Address: |
64 NEWFORGE LANE
BELFAST
BT9 5NF
Northern Ireland
|
Address: |
Glenbuck
81 Glenbuck Road
Dunloy
Ballymoney
BT44 9EL
Northern Ireland
|
Site Name: |
Glenbuck
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00959NWNI
|
Capacity: |
9200
|
Status: |
Live
|
Accreditation Date: |
6/6/2005
|
|
|
Commission Date: |
2/21/2017
|
|
|
Applicant: |
Mosslee Limited
|
Applicant Address: |
64 NEWFORGE LANE
BELFAST
BT9 5NF
Northern Ireland
|
Address: |
Glenbuck
81 Glenbuck Road
Dunloy
Ballymoney
BT44 9EL
Northern Ireland
|
|
Assumptions: Capacity: 9200kW 9.2 MW, Thus over the month Capacity * 720 hours per month = 6624 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 1820 | 19.78% | Issued | 01/03/2018 | | | 2463 | 26.77% | Issued | 01/02/2018 | | | 2708 | 29.43% | Issued | 01/01/2018 | | | 3149 | 34.23% | Issued | 01/12/2017 | | | 2296 | 24.96% | Retired | 01/11/2017 | | | 2074 | 22.54% | Retired | 01/10/2017 | | | 2550 | 27.72% | Retired | 01/09/2017 | | | 2200 | 23.91% | Retired | 01/08/2017 | | | 1542 | 16.76% | Retired | 01/07/2017 | | | 1410 | 15.33% | Retired | 01/06/2017 | | | 1754 | 19.07% | Retired | 01/05/2017 | | | 1377 | 14.97% | Issued | 01/04/2017 | | | 1761 | 19.14% | Issued | 01/03/2017 | | | 1306 | 14.20% | Issued | 01/02/2017 | | | 319 | 3.47% | Issued |
|
Capacity: 18.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/9/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|